Education Background: 1996/9-2000/6, Beihang University,Material Processing and Control Engineering, Bachelor 2000/9-2008/1, Beihang University, Mechanical Manufacturing and Automation, Doctor 2008/3-2011/7, Beihang University, Aeronautics and Astronautics Manufacturing Engineering, Post-doc. 2011/7 – , Zhengzhou University of Light Industry,Mechanical and Electrical Engineering Institute, Lecturer |
Publications: [1]Qiao Dongping,YangJianjun , Research on Agent-based Distributed and Integrated Manufacturing Execution System Framework, Manufacturing Technology & Machine Tool, 2006, 8:57-61(in Chinese) [2] Qiao Dongping ,YangJianjun ,Research on Multi-Agent Based Distributed Rule-Based Scheduling, Mechanical Science and Technology for Aerospace Engineering,2007,26(2):160-166(in Chinese) [3]Qiao Dongping,Ma Jun,Yang Jianjun, The Application of Multi-level Mixed Programming and Agent in Production Schedule, Mechanical Science and Technology for Aerospace Engineering,2012,31(8):1334-1340(in Chinese) [4]Dongping Qiao, Jianjun Yang ,Developing an Ontology for Task Management of Manufacturing Process ,Proceedings of the International Conference on Complex Systems and Applications,Huhhot,China, 2006,p:69-72 [5]Qiao Dongping, YANG Jianjun,Research about Web Services Based Integration of Manufacturing Process Information,Proceedings of the 9thInternational Conference on Progress of Machining Technology, Key Engineering Materials(ICPMT 2009), Vols. 407-408,2009,p :287-291 [6]Qiao Dongping ,Gengjunxiao.Research on Production Process Control for Discrete Manufacturing Enterprise Based on Integration of MRPII/JIT/TOC,Design and Manufacture in Mechanical Engineering,2013:483-488(ISMAM 2013,Nanjing, China) [7] Dongping Qiao,Xiaojuan Liu , Hao Li.Research on SysML-based modeling for production management system.Material Processing and Manufacturing III,2013:1868-1874(AEMT 2013, Zhangjiajie, China) [8]Qiao Dongping,Ma Jun,Yang Jianjun, The Application of Multi-level MixedProgramming and Agent in Production Schedule, Mechanical Science and Technologyfor Aerospace Engineering,2012,31(8):1334-1340(in Chinese) [9]Qiao Dongping ,Xiao Yanqiu,Luo Guofu, Process oriented management of complexproduct manufacturing data, Modern Manufacturing Engineering,2013,5:44-49(inChinese) [10].QIAO Dongping, LI Hao,XIAO Yanqiu, Agent-oriented modeling for distributedproduction management system, Manufacturing Automation,2013,5:77-81(in Chinese) [11] LI Hao,QIAO Dongping, Review on modular structure modeling method for complexintegrated service mechanical product, Journal of Hebei University of Science andTechnology,2013,34(2):102-107(in Chinese) [12]LI Hao,QIAO Dongping, A modular structure modeling method for complex integratedservice mechanical products, Journal of Hebei University of Science andTechnology,2013,34(3):182-187(in Chinese) [13] Qiao D , Wang Y , Pei J ,et al.Research on green single machine scheduling based on improved ant colony algorithm:[J].Measurement and Control, 2022, 5(1-2):35-48. [14]Qiao, D., Duan, L., Li, H. et al. Optimization of job shop scheduling problem based on deep reinforcement learning. Evol. Intel. (2023).
|
Projects: [1]Informationization planning for an equipment manufacturing enterprise , Enterprise Technology Reformation, project manager,2011-2014 [2]Research on Production Logistics Control Based on Integration of MRPII/JIT/TOC(No. 132102210426), Key Science and Technology Project of He’nan Province, Principle Investigator, 2013-2015 [3] Research and Application of Distributed Production Scheduling for Digital Twin Workshops,(No.20A460029),Key scientific research projects in higher education institutions,2020.01-2022.12 [4]Research and Application of Key Technologies for Green Multi Objective Scheduling in Flexible Workshop under Digital Twin Environment(No. 132102210426), Key Science and Technology Project of He’nan Province, Principle Investigator, 2024-2025
|