Publications: [1]LikeZhang,Chong Liang,HaoLi*, et al. Optimal Production Scheduling of Critical Spare Parts under Multi-Category Mixed Order Constraints. Computers & Industrial Engineering, 2025:111517. (SCI) [2]LikeZhang, Hua Wang, Wenpu Liu, et al. Integrated optimization of production and maintenance scheduling with third-party worker resource constraints in distributed parallel machines environment. Computers & Industrial Engineering, 2024, 198: 110647. (SCI) [3]Zhang Like, Deng Qianwang, Wen Xiaoyu,et al. Optimal production scheduling with multi-round information interaction for demander-dominated decentralized scheduling problem. Engineering Applications of Artificial Intelligence, 2023, 123: 106228.(SCI) [4]Zhang Like, Deng Qianwang, Wang Zhen,et al. Collaborative scheduling of production resources and spare parts inventory for distributed equipment with feedback guidance and minimum capacity loss. Swarm and Evolutionary Computation, 2022, 75: 101200. (SCI) [5]Zhang Like, Deng Qianwang, Miao Bingxin,et al. Parallel service mode of production and inventory for spare part inventory optimization. Knowledge-Based Systems, 2022, 241: 108282. (SCI) [6]Zhang Like, Deng Qianwang, Lin Ruihang,et al. A combinatorial evolutionary algorithm for unrelated parallel machine scheduling problem with sequence and machine-dependent setup times, limited worker resources and learning effect. Expert Systems with Applications, 2021, 175: 114843. (SCI) [7]Zhang Like, Deng Qianwang, Zhao Yan,et al. Joint optimization of demand-side operational utility and manufacture-side energy consumption in a distributed parallel machine environment. Computers & Industrial Engineering, 2022, 164: 107863. (SCI) [8]Zhang Like, Deng Qianwang, Gong Guiliang, Han Wenwu. A new unrelated parallel machine scheduling problem with tool changes to minimise the total energy consumption. International Journal of Production Research, 2020, 58(22): 6826-6845. (SCI) [9]ZhangLike,Wenpu Liu,Hua Wang,et al. Flexible Job-Shop Scheduling Integrating Carbon Cap-And-Trade Policy and Outsourcing Strategy. Sustainability, 2025, 17(15): 6978. (SCI) [10]Zhang Like, Liang Chong, Wu Junwei,et al. Optimization of MRO Service WorkerScheduling for Multi-site Complex Equipment with Multi-categoryCustomerConstraints. Journal ofMechanical Engineering, 2025, 1-13. (EI) |
Projects: [1]Youth Scientists Project of the Henan Provincial Joint Research Fund for Science and Technology Development(245200810082), 2024.12-2027.12,chaired [2]National Natural Science Foundation of China (52305560),2024.01-2026.12,chaired [3]Key Scientific and Technological Research Project in Henan Province (232102221010),2023.01-2024.12,chaired [4]Key Scientific and Technological Research Project in Henan Province (252102220032),2025.01-2026.12,chaired [5]Doctoral Program of Zhengzhou University of Light Industry (2022BSJJZK04),2023.01-2025.12,chaired |